ABOUT US

28 Years

Leader in Medical Equipment Installation & Seismic Anchoring

  • 28 Years Hospital & OSHPD Experience
  • 100% Self Performed Work
  • Over 200+ completed Medical Facility Projects in the past 10 years
  • Over $13 million in healthcare contract revenue in the past 5 years
  • 100% Union workforce Northern & Southern CA
  • Licensed in CA, AZ, TX, NV

    INNOVATION

    Before problems arise, we find it beneficial to work side by side with hospital owners, architects & equipment planners to provide formal solutions, which help reduce costs & set an achievable overall tempo for the project duration.

  • DESIGN PHASE STRATEGIES
  • TACTICAL EXECUTIVE SUPPORT & CONSULTING
  • BUILDING INFORMATION MODELING (BIM) COORDINATION
  • Scripps Encinitas Critical Care Building & Central Energy Plant | 2014 | $502,591 | 72,321 sf | Encinitas, CA Complete OFCI Medical Equipment Package, including all Headwall Systems & Patient Lifts



    On the Record

    Safety First

    With zero citations, recordable incidents, lost time, fatalities or days away Restricted Transfer - our commitment to safety is unparallelled.


    Systems for success

    Operations/Lean Method

    Building Information Modeling (BIM) Coordination
    Conceptual Estimating
    Preconstruction Services, including Auto CAD & Revit
    Scheduling/Construction Planning
    Safety Procedures
    Warehouse Management
    Receive, Track & Coordinate Deliveries
    Installation/Seismic Anchorage
    OSHPD Requirements, Inspections & Sign-Off
    Project Close-out and Training


    The quality of the work and your attention to detail was exceptional

    Joseph R. G. - Millie and Severson

    SERVICES

    PRECONSTRUCTION SERVICES

    Step 1: Compile Data
  • Equipment Schedule
  • Equipment Plans
  • Structural Drawings
  • Product Data
    Step 2: Use Compiled Data to generate a set of the
    following:

  • Equipment Size & Layout
  • Required Spacing
  • Backing
  • MEP Requirement & Locations
  • To Scale
  • SEISMIC ANCHORING

  • Medical
  • Special Procedure Room
  • Lab
  • Pharmacy
  • Kitchen
  • Furniture
  • And much moreā€¦.!
  • 28 Years of OSHPD Experience

    MEDICAL EQUIPMENT INSTALLATION

  • Headwall Systems
  • Power Columns
  • Bio-Safety Cabinets
  • OR Lights & Booms
  • Patient Lifts
  • Surgery Equipment
  • Hazmat Buildings
  • All OFCI, CFCI, VFCI & OFOI
  • Kaiser Permanente
    Kaiser Irvine Medical Center 5th/6th Floor | 2018 | $344,655 | 92,415 sf | Irvine, CA Complete OFCI Medical Equipment Package, including all Headwall Systems & Patient Lifts
    Kaiser San Diego Central Medical Center Hospital & Energy Center | 2017 | $3,097,120 | 617,215 sf | San Diego, CA Complete OFCI Medical Equipment Package, including all Headwall Systems, Patient Lifts, Walk-in Coolers, Hazmat Container, and Central Sterile Power Poles

    CP Contractors, Inc. has been installing the OF/CI equipment on our OSHPD projects, and their knowledge of code requirements when performing these installations makes me highly recommend them for any equipment installation needs

    Joseph P. De Luca, Healthcare Design & Construction

    PORTFOLIO

    A Portfolio of Success

    Healthcare Qualifications

    CP Contractors, Inc. is a leader in the hospital construction sector of business. We specialize in design phase strategy & implementation, medical equipment installation, and seismic anchoring.




    Installation Experts

    Qualifications & Certifications

    OSHA30 CPR/First Aid Forklift

    Liko Patient Lifts Installation Amico Go Lifts Installation & Service

    OPERATING ROOMS:
    Amico Steris Trumpf

    HEADWALLS:
    Amico Amico Hill-Rom Modular

    CP Contractors, Inc. is our preferred installation company.

    Victor Guevara, Mortech Manufacturing

    Proud to have worked with

    Medical Center Experience